For the past few weeks I have spent most of my time tweaking the kayak and spending time on the water, trying to put as many miles under the keel as possible. The basic design is finished. I modified the outrigger float from digging into the waves by lifting the ends.
The first sail reef works well and is easy to work. I have used it several times already. To meet the Watertribe rules I need to install another reef at the next batten.
There are about ten weeks left until the North Carolina Challenge race. I went out this weekend into some rough waves and took some video. I will post it as soon as I edit it…
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.